First page Back Continue Last page Summary Graphics
OpenBSD Software Development Process
Fixed deadlines discourage massive changes
- Frequent snapshots (weekly near release)
- System always in a ready-to-build state
 - No extended period when system "closed for repairs"
 
 - Release every 6 months (always on time or early)
- Features dropped if not release-worthy
 - Tree locked before release (fixes only)
 - Intensive testing by developers and users
 - New features only introduced after unlock
 
 
Features vs. deadline debate
- Features get left out
- i386 APM delayed by one release
 - Some architectures left out if unstable